Daily Field Report

Date :05/19/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/19/2026 07:30
Onsite Hours :9:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Sunny
Departure Time :05/19/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative was on site to observe the wall contractor continue backfilling at the north side bridge abutment. The grading contractor continued hauling in backfill materials. Our representative performed density tests using a Troxler Nuclear gauge model 3430, serial no. 91643 and performed a field proctor on the blended (mixed) onsite materials. Compaction results were found to meet site specifications.

The writer also observed subgrade soil conditions at the drive entrance to Seven Hills for 4 lots in phase 13 which were probed using a rounded end steel rod. The residual materials were found to be suitable and stable for base stone placement.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

 

Fill placement,compacting efforts,and density tests performed.

Subgrade and observations at drive entrance by probing.

Technician Signature / DateClyde Smith, May 19, 2026
Reviewer Name / DateKenneth Mosman, May 28, 2026