- Home
- Density Test Report Report ID: 94672
- Edit Download Report
Density Test Report
Date :05/20/2026
Project No :2026C142
Client Company :KFE
Arrival Time :05/20/2026
Onsite Hours :
Name of the Project :Bailey Station Way
Project Location :Sharpsburg
Weather :overcast
Departure Time :05/20/2026
ASEC Technician Name :Russell Hendrix
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 05/20/2026 | 1 | 22.3 | 94.5 | 2026-155 | 103.1 | 19.1 | 91.7 | 90 | D6938 | Pass |
| Location : | North - Center of site, Elv/Depth :2 to 3 feet above original grade | |||||||||
| Comment : | proctor unknown | Gauge Serial No. :38069 | ||||||||
| 05/20/2026 | 2 | 25 | 79.8 | 2026-159 | 94.5 | 25.2 | 84.4 | 90 | D6938 | Fail |
| Location : | South center of site, Elv/Depth :2 to 3 feet above original grade | |||||||||
| Comment : | Recompaction is required. | Gauge Serial No. :38069 | ||||||||
Technician Signature / DateRussell Hendrix, May 20, 2026
Reviewer Name / DateKenneth Mosman, June 03, 2026
