Skip to content

Density Test Report

Date :05/21/2026
Project No :2026C142
Client Company :KFE
Arrival Time :05/21/2026 09:00
Onsite Hours :02:00
Name of the Project :Bailey Station Way
Project Location :Sharpsburg
Weather :sunny
Departure Time :05/21/2026 11:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/21/2026 1 19 117.1 2026-155 103.1 19.1 95.4 95 D6938 Pass
Location : Suite 3, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :38069
05/21/2026 2 19.6 122.6 2026-155 103.1 19.1 99.4 95 D6938 Pass
Location : Suite 3, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :38069
05/21/2026 3 23.3 101.8 2026-155 103.1 19.1 98.7 95 D6938 Pass
Location : Suite 3, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, May 21, 2026
Reviewer Name / DateKenneth Mosman, June 03, 2026