Daily Field Report

Date :05/29/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/29/2026 07:00
Onsite Hours :08:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :cloudy
Departure Time :05/29/2026 15:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative was on site and assisted in sampling concrete for the south side wall pour. The writer observed placement of 252 cubic yards of 4000 psi concrete mix that was placed by a pump truck.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Five sets of test cylinders were molded

Performing air test

Concrete pour by pumping

Wall pour at south side bridge

performing air test

Performing slump test

Technician Signature / DateClyde Smith, May 29, 2026
Reviewer Name / DateKenneth Mosman, June 03, 2026