Density Test Report

Date :06/04/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :06/04/2026 08:00
Onsite Hours :07:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :06/04/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/04/2026 1 18 95.6 2025-033 SP 104.0 16.2 91.9 98 D6938 Fail
Location : Lot #28, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
06/04/2026 2 22.7 97.4 2025-036 SP 107.0 18.5 91.0 98 D6938 Fail
Location : Lot #28, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
06/04/2026 3 21.3 95.0 2025-033 SP 104.0 16.2 91.3 98 D6938 Fail
Location : Lot #28, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :38069
06/04/2026 4 21.6 95.6 2025-033 SP 104.0 16.2 91.9 98 D6938 Fail
Location : Lot #27, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :38069
06/04/2026 5 21.9 93.7 2025-033 SP 104.0 16.2 90.1 98 D6938 Fail
Location : Lot #27, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, June 4, 2026
Reviewer Name / DateKenneth Mosman, July 06, 2026