Density Test Report

Date :06/05/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :06/05/2026 12:00
Onsite Hours :04:30
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :06/05/2026 16:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/05/2026 1 18.6 94.9 2025-033 SP 104.0 16.2 91.3 98 D6938 Fail
Location : Backfill at 8" sanitary sewer line between manhole # 10 and 11, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
06/05/2026 2 18.8 96.2 2025-033 SP 104.0 16.2 92.5 98 D6938 Fail
Location : Backfill at 8" sanitary sewer line between manhole # 10 and 11, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
06/05/2026 3 17.6 103.1 2025-033 SP 104.0 16.2 99.1 98 D6938 Pass
Location : Retest #1, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
06/05/2026 4 18.7 102.9 2025-033 SP 104.0 16.2 98.9 98 D6938 Pass
Location : Retest #2, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, June 5, 2026
Reviewer Name / DateKenneth Mosman, June 26, 2026