- Home
- Concrete Test Report Report ID: 95370
- Edit Download Report
Concrete Test Report
Date :06/17/2026
Project No :2026C125
Client Company :Lewis Contracting
Arrival Time :06/17/2026 09:00
Onsite Hours :02:00
Name of the Project :Pittman Park - Garibaldi St. Stormwater
Project Location :Atlanta
Weather :sunny
Departure Time :06/17/2026 11:00
ASEC Technician Name :Samara Simha Reddy Kandi
Concrete Placement Information
Location(S):
N/A
Testing:
2 Set of concrete specimens (2 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 2 Sets of concrete specimens/ 2 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete specimens/ 2 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Cylinders were made by Lewis contracting.
No concrete temperature, slump, air content and unit weight values.
Cylinders made on 06/09/26 and told us to pick up on 06/17/26.
Break at 7 day and 28 day(ASTM C39)
Date: 06/09/2026
CONSTRUCTION MATERIALS
Ticket Created: 12:34 PM
Load Start: 12:53 PM
Order Date: 06/09/2026
Slump
4
Load
6 & 7
Field Test Data
Specimen Type Selection : Cylinder
Set Number :N/A
Date Sampled :06/09/2026
Sampled By :N/A
Contractor :N/A
Truck Number :62382956
Time Batched :N/A
Location of Placement :footings
Number of samples cast :2
Ambient Temperature (°f) :N/A
Slump (in.) :N/A
Water added (gal.) :N/A
Laboratory Number :N/A
Time Sampled :N/A
Weather Condition :sunny
Concrete Supplier :Quickrete construction materials
Mix ID :N/A
Quantity of Load (cu. yd.) :9
Sample Cast :2
Specified Strength :4500
Concrete Temperature(°f) :N/A
Air Content (%) :N/A
Unit Weight (pcf) :N/A
Strength Test Results
| Specimen Number | Scheduled Test Date | Date Tested | Age (days) | Dia(in.) | Area (sq in.) | Maximum Loads (lbf) | Strength (lbs) | % Design Strength | Type of Fracture |
|---|
UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.
(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed
Technician Signature / DateSamara Simha Reddy Kandi, June 17, 2026