Skip to content

Concrete Test Report

Date :06/06/2026
Project No :2026C115-WO 1
Client Company :WSP
Arrival Time :06/06/2026 4
Onsite Hours :NaN:00
Name of the Project :Lanier Islands Parkway
Project Location :Buford
Weather :clear and sunny
Departure Time :06/06/2026 11:30
ASEC Technician Name :Narayana Ganesh Undavalli

Concrete Placement Information

Location(S): N/A
Testing: 2 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
2 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks: TEST -1 - Poured at panel A-22 At 10 yds time = 5:05 Am concrete temperature = 80 ambient temperature = 62 slump = 6 Air = 1.7 unit wt of concrete = 146. Test -2 - Poured at panel 13-19 At 110 yds concrete temperature = 880 ambient temperature = 65 slump = 6 Air = 1.5 unit wt of concrete = 144.
Technician Signature / DateNarayana Ganesh Undavalli, June 6, 2026