- Concrete Test Report Report ID: 95375
- Edit Download Report
Concrete Test Report
Date :06/06/2026
Project No :2026C115-WO 1
Client Company :WSP
Arrival Time :06/06/2026 4
Onsite Hours :NaN:00
Name of the Project :Lanier Islands Parkway
Project Location :Buford
Weather :clear and sunny
Departure Time :06/06/2026 11:30
ASEC Technician Name :Narayana Ganesh Undavalli
Concrete Placement Information
Location(S):
N/A
Testing:
2 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 2 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
TEST -1 - Poured at panel A-22
At 10 yds time = 5:05 Am
concrete temperature = 80
ambient temperature = 62
slump = 6
Air = 1.7
unit wt of concrete = 146.
Test -2 - Poured at panel 13-19
At 110 yds
concrete temperature = 880
ambient temperature = 65
slump = 6
Air = 1.5
unit wt of concrete = 144.
Technician Signature / DateNarayana Ganesh Undavalli, June 6, 2026