- Home
- Density Test Report Report ID: 95612
- Edit Download Report
Density Test Report
Date :06/24/2026
Project No :2026C125
Client Company :Lewis Contracting
Arrival Time :06/24/2026 08:00
Onsite Hours :07:00
Name of the Project :Pittman Park - Garibaldi St. Stormwater
Project Location :Atlanta
Weather :sunny
Departure Time :06/24/2026 15:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/24/2026 | 1 | 26.6 | 97.1 | 2026-076 | 104.4 | 20.1 | 93.0 | 98 | D6938 | Fail |
| Location : | Existing to d-3 roadway, Elv/Depth :at finished grade | |||||||||
| Comment : | In-situ moisture contents way above optimum. Recommend scarifying, aeration and recompaction. Contractor filled approximately 4 to 6 feet in this area without any compaction testing. | Gauge Serial No. :77-19952 | ||||||||
| 06/24/2026 | 2 | 23.6 | 86.0 | 2026-076 | 104.4 | 20.1 | 82.4 | 98 | D6938 | Fail |
| Location : | Existing to d-3 roadway, Elv/Depth :at finished grade | |||||||||
| Comment : | In-situ moisture contents above optimum moisture content. | Gauge Serial No. :77-19952 | ||||||||
Technician Signature / DateSean Willett, June 24, 2026
Reviewer Name / DateKenneth Mosman, July 06, 2026
