- Density Test Report Report ID: 95742
- Edit Download Report
Density Test Report
Date :06/29/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :06/29/2026 10:00
Onsite Hours :02:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :sunny
Departure Time :06/29/2026 12:00
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/29/2026 | 1 | 18.3 | 96.8 | 2025-031 SP | 101.0 | 20.7 | 95.8 | 95 | D6938 | Pass |
| Location : | Dead man footing (10' in from side), Elv/Depth :Top of footing | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/29/2026 | 2 | 16.4 | 100.7 | 2025-033 SP | 104.0 | 16.2 | 96.8 | 95 | D6938 | Pass |
| Location : | Dead man footing (50' in from side), Elv/Depth :Top of footing | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/29/2026 | 3 | 18.6 | 118.6 | 2025-033 SP | 104.0 | 16.2 | 96.2 | 95 | D6938 | Pass |
| Location : | Dead man footing (80' in from side), Elv/Depth :Top of footing | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
Technician Signature / DateSamara Simha Reddy Kandi, June 29, 2026
Reviewer Name / DateKenneth Mosman, July 08, 2026