Skip to content

Density Test Report

Date :07/01/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :07/01/2026 09:00
Onsite Hours :02:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/01/2026 11:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/01/2026 1 19.6 96.9 2025-031 SP 101.0 20.7 95.9 95 D6938 Pass
Location : Lot #29, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
07/01/2026 2 19.9 100.0 2025-031 SP 101.0 20.7 99.0 95 D6938 Pass
Location : Lot #29, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
07/01/2026 3 19.1 105.6 2025-036 SP 107.0 18.5 98.7 95 D6938 Pass
Location : Lot #28, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
07/01/2026 4 19.1 100.3 2025-031 SP 101.0 20.7 99.3 95 D6938 Pass
Location : Lot #28, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 1, 2026
Reviewer Name / DateKenneth Mosman, July 08, 2026