- Home
- Concrete Test Report Report ID: 95988
- Edit Download Report
Concrete Test Report
Date :06/22/2026
Project No :2026C125
Client Company :Lewis Contracting
Arrival Time :06/22/2026 12:00
Onsite Hours :-5:30
Name of the Project :Pittman Park - Garibaldi St. Stormwater
Project Location :Atlanta
Weather :clear and sunny
Departure Time :06/22/2026 7:30
ASEC Technician Name :Narayana Ganesh Undavalli
Concrete Placement Information
Location(S):
N/A
Testing:
2 Set of concrete specimens (6 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 2 Sets of concrete specimens/ 6 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete specimens/ 6 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Test 1
Temp of concrete = 85
amb temp = 85
slump = 3.5
air = 0.75
unit wt of concrete = 142.
Test 2
Temp of concrete = 90
amb temp = 85
slump = 5
air = 1.5
unit wt of concrete = 142.
Test 3
Temp of concrete = 90
amb temp = 75
Slump = 4
air = 1.5
unit wt of concrete = 143.
Technician Signature / DateNarayana Ganesh Undavalli, June 22, 2026