Date :07/07/2026
Project No :2026C122
Client Company :WSP
Arrival Time :07/07/2026 9:00
Onsite Hours :03:00
Name of the Project :Courtesy Pkwy Expansion
Project Location :Conyers
Weather :clear and sunny
Departure Time :07/07/2026 12::0
ASEC Technician Name :Narayana Ganesh Undavalli
Concrete Placement Information
Location(S):
N/A
Testing:
1 Set of concrete specimens (2 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 1 Sets of concrete specimens/ 2 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete specimens/ 2 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Test 1
Temp of concrete = 88
Amb temp = 81
Slump = 4
air = 4
unit wt of concrete = 145.