Concrete Test Report
Date :06/24/2026
Project No :2026C122
Client Company :WSP
Arrival Time :06/24/2026 9:00
Onsite Hours :-8:00
Name of the Project :Courtesy Pkwy Expansion
Project Location :Conyers
Weather :clear and sunny
Departure Time :06/24/2026 1:00
ASEC Technician Name :Narayana Ganesh Undavalli
Concrete Placement Information
Location(S):
N/A
Testing:
2 Set of concrete specimens (4 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 2 Sets of concrete specimens/ 4 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete specimens/ 4 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Class A pour for wall
Temp of concrete = 80
amb temp = 75
Slump = 2
air = 2
unit wt of concrete = 142.
Class B pour for curb side
Temp of concrete = 82
amb temp = 78
slump = 2.5
air = 2.9
unit wt of concrete = 143.
Technician Signature / DateNarayana Ganesh Undavalli, June 24, 2026