Skip to content

Concrete Test Report

Date :06/24/2026
Project No :2026C122
Client Company :WSP
Arrival Time :06/24/2026 9:00
Onsite Hours :-8:00
Name of the Project :Courtesy Pkwy Expansion
Project Location :Conyers
Weather :clear and sunny
Departure Time :06/24/2026 1:00
ASEC Technician Name :Narayana Ganesh Undavalli

Concrete Placement Information

Location(S): N/A
Testing: 2 Set of concrete specimens (4 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
2 Sets of concrete specimens/ 4 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks: Class A pour for wall Temp of concrete = 80 amb temp = 75 Slump = 2 air = 2 unit wt of concrete = 142. Class B pour for curb side Temp of concrete = 82 amb temp = 78 slump = 2.5 air = 2.9 unit wt of concrete = 143.
Technician Signature / DateNarayana Ganesh Undavalli, June 24, 2026