Skip to content

Density Test Report

Date :07/06/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :07/06/2026 08:00
Onsite Hours :07:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/06/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/06/2026 1 21.8 96.7 2025-031 SP 101.0 20.7 95.7 95 D6938 Pass
Location : Future lots, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
07/06/2026 2 16.4 103.6 2025-035 SP 107.8 13.0 96.1 95 D6938 Pass
Location : Future lots, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
07/06/2026 3 18.2 101.0 2025-033 SP 104.0 16.2 97.1 95 D6938 Pass
Location : Future lots, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 6, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026