Skip to content

Daily Field Report

Date :07/07/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :07/07/2026 12:00
Onsite Hours :04:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :clear and sunny
Departure Time :07/07/2026 16:00
ASEC Technician Name :Narayana Ganesh Undavalli

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Crew continued working on Lots #32, 33, 34 and 35. Fill material was placed in lifts, spread using a crawler bulldozer, and compacted using both a sheep-foot roller and a Caterpillar 815. Density tests were performed, and the results met the required project compaction specifications.

At the site the crew started excavating beside Lots #60, 61 and 62 and the adjacent roadway placing storm drainpipe followed by No.57 stone around the drainpipe. The fill material that was then placed and compacted using a sheep-foot roller.

At the Buford neighborhood site, the crew continued trench excavation using a hydraulic excavator equipped with a rock grinder to achieve the required depth and width.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateNarayana Ganesh Undavalli, July 7, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026