Skip to content

Daily Field Report

Date :07/09/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :07/09/2026 08:00
Onsite Hours :04:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/09/2026 12:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

At Lots 29 and 30, the crew continued fill placement and compaction activities. Fill material was placed, spread, and leveled to provide a uniform lift before being compacted using a sheep foot roller. Multiple roller passes were made across the lot areas to achieve consistent compaction. I observed the placement and compaction operations and performed in-place density testing at selected locations within both lots. The density test results met the required project compaction specifications at the locations tested. The compacted fill appeared firm, uniform, and stable at the time of inspection.

In-place density tests were performed on the backfill between SSMH Z19.1 and SSMH Z19.2. The test results met the required project compaction criteria at the locations tested.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateSamara Simha Reddy Kandi, July 9, 2026