- Density Test Report Report ID: 96412
- Edit Download Report
Density Test Report
Date :07/22/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :07/22/2026 09:30
Onsite Hours :05:30
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :07/22/2026 15:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 07/22/2026 | 1 | 13.5 | 112.8 | 2025-033 SP | 104.0 | 16.2 | 95.6 | 95 | D6938 | Pass |
| Location : | Cul-de-sac phase 3a, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
| 07/22/2026 | 2 | 11.9 | 104.7 | 2025-033 SP | 104.0 | 16.2 | 100.7 | 95 | D6938 | Pass |
| Location : | Cul-de-sac phase 3a, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
| 07/22/2026 | 3 | 17.2 | 94.5 | 2025-033 SP | 104.0 | 16.2 | 90.9 | 95 | D6938 | Fail |
| Location : | Cul-de-sac phase 3a, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Recompaction is required. | Gauge Serial No. :77-19952 | ||||||||
Technician Signature / DateSean Willett, July 22, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026