Density Test Report

Date :07/22/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :07/22/2026 09:30
Onsite Hours :05:30
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :07/22/2026 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/22/2026 1 13.5 112.8 2025-033 SP 104.0 16.2 95.6 95 D6938 Pass
Location : Cul-de-sac phase 3a, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :77-19952
07/22/2026 2 11.9 104.7 2025-033 SP 104.0 16.2 100.7 95 D6938 Pass
Location : Cul-de-sac phase 3a, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :77-19952
07/22/2026 3 17.2 94.5 2025-033 SP 104.0 16.2 90.9 95 D6938 Fail
Location : Cul-de-sac phase 3a, Elv/Depth :2 feet below finished grade
Comment : Recompaction is required. Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, July 22, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026