- Home
- Daily Field Report Report ID: 96575
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was onsite to observe the wall contractor (RWS) strip forms from the second wall pour for the dead man footing.
The writer also picked up two sets of concrete cylinders cast from yesterday’s pour and transported to the to the office. Observed site conditions after an early morning rain event. The paving contractor was onsite and begin installing check dams for the curb lines using silt fence protection.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Second wall pour after stripped forms


Site conditions after rain event washed sub base stone

Erosion occurred at curb line


Paving contractor installing check dams

Eroded conditions at curb line

Standing water at Nature Walk sub grade west of dead man footing
