Density Test Report

Date :08/05/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :08/05/2026 07:30
Onsite Hours :05:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :cloudy
Departure Time :08/05/2026 12:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/05/2026 1 20.9 99.0 2025-031 SP 101.0 20.7 98.0 95 D6938 Pass
Location : Building Lot #33, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
08/05/2026 2 20.6 121.6 2025-033 SP 104.0 16.2 96.9 95 D6938 Pass
Location : Building lot 33, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
08/05/2026 3 16.7 103.0 2025-033 SP 104.0 16.2 99.0 95 D6938 Pass
Location : Building lot 34, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
08/05/2026 4 18.6 99.7 2025-033 SP 104.0 16.2 95.9 95 D6938 Pass
Location : Building lot 34, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
08/05/2026 5 12.9 101.2 2025-033 SP 104.0 16.2 97.3 95 D6938 Pass
Location : North side embankment at detention pond dam, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :91643
08/05/2026 6 12.4 100.4 2025-033 SP 104.0 16.2 96.5 95 D6938 Pass
Location : North side embankment at detention pond dam, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :91643
08/05/2026 7 13.9 100.7 2025-033 SP 104.0 16.2 96.8 95 D6938 Pass
Location : North side embankment at detention pond dam, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 5, 2026
Reviewer Name / DateKenneth Mosman, August 11, 2026