Density Test Report

Date :08/10/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :08/10/2026 07:30
Onsite Hours :11:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :cloudy
Departure Time :08/10/2026 18:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/10/2026 1 12.4 96.1 2025-033 SP 104.0 16.2 92.4 95 D6938 Fail
Location : Backfill at bridge abutment west side, Elv/Depth :7.5 feet below finished grade
Comment : Gauge Serial No. :91643
08/10/2026 2 13.7 110.1 2025-033 SP 104.0 16.2 93.1 95 D6938 Fail
Location : Backfill at bridge abutment west side, Elv/Depth :7.5 feet below finished grade
Comment : Gauge Serial No. :91643
08/10/2026 3 15.1 97.0 2025-033 SP 104.0 16.2 93.3 95 D6938 Fail
Location : Backfill at bridge abutment west side, Elv/Depth :7.5 feet below finished grade
Comment : Gauge Serial No. :91643
08/10/2026 4 15.7 96.9 2025-033 SP 104.0 16.2 93.2 95 D6938 Fail
Location : Backfill at bridge abutment west side, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 10, 2026
Reviewer Name / DateKenneth Mosman, August 19, 2026