- Home
- Density Test Report Report ID: 96834
- Edit Download Report
Density Test Report
Date :08/13/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :08/13/2026
Onsite Hours :
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :sunny
Departure Time :08/13/2026
ASEC Technician Name :Russell Hendrix
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/13/2026 | 1 | 17.3 | 100.0 | North Bridge mixture | 106.8 | 17.5 | 93.6 | 95 | D6938 | Fail |
| Location : | North side 20 feet from wall, Elv/Depth :-4 feet | |||||||||
| Comment : | Mix of soils | Gauge Serial No. :92204 | ||||||||
| 08/13/2026 | 2 | 20.1 | 94.3 | North Bridge mixture | 106.8 | 17.5 | 88.3 | 95 | D6938 | Fail |
| Location : | South side 10 feet from wall, Elv/Depth :-4 feet | |||||||||
| Comment : | mix of soils | Gauge Serial No. :92204 | ||||||||
Technician Signature / DateRussell Hendrix, August 13, 2026
