Density Test Report

Date :08/17/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :08/17/2026 07:30
Onsite Hours :07:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :cloudy
Departure Time :08/17/2026 14:30
ASEC Technician Name :

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/17/2026 1 13.3 99.0 2025-033 SP 104.0 16.2 95.2 95 D6938 Pass
Location : Roadway between B6 ST JB and B5 ST JB, Elv/Depth :-14'
Comment : Gauge Serial No. :91643112.2
08/17/2026 2 14.1 98.7 2025-033 SP 104.0 16.2 94.9 95 D6938 Fail
Location : , Elv/Depth :-14'
Comment : Gauge Serial No. :91643
08/17/2026 3 14.2 100.0 2025-033 SP 104.0 16.2 96.2 95 D6938 Pass
Location : , Elv/Depth :-14'
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 17, 2026