Date :08/21/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :08/21/2026 11:30
Onsite Hours :03:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :08/21/2026 14:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/21/2026 1 22.4 90.9 2025-032 SP 94.9 25.0 95.8 95 D6938 Pass
Location : Roadway between B6.1-DWCB and B4-STJB, Elv/Depth :-10'
Comment : Gauge Serial No. :91643
08/21/2026 2 22.9 91.4 2025-032 SP 94.9 25.0 96.3 95 D6938 Pass
Location : same as 1, Elv/Depth :-10'
Comment : Gauge Serial No. :91643
08/21/2026 3 13.9 100.3 2025-033 SP 104.0 16.2 96.4 95 D6938 Pass
Location : same as 1, Elv/Depth :-10'
Comment : Gauge Serial No. :91643
08/21/2026 4 14.2 99.2 2025-033 SP 104.0 16.2 95.4 95 D6938 Pass
Location : Same as 1, Elv/Depth :-10'
Comment : Gauge Serial No. :91643
08/21/2026 5 15.1 101.0 2025-035 SP 107.8 13.0 93.7 95 D6938 Fail
Location : Embankment slope at bridge abutment between S.S. manholes #3 and 2, Elv/Depth :-4'
Comment : Gauge Serial No. :91643
08/21/2026 6 16.4 101.2 2025-035 SP 107.8 13.0 93.9 95 D6938 Fail
Location : Same as # 5, Elv/Depth :-4'
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 21, 2026