Density Test Report

Date :08/25/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :08/25/2026 07:30
Onsite Hours :07:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :08/25/2026 14:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/25/2026 1 25.2 89.6 2025-032 SP 94.9 25.0 94.4 95 D6938 Fail
Location : Backfill at the 36" RCP outlet from OCS at Pond A, Elv/Depth :6 feet below top of OCS
Comment : Gauge Serial No. :91643
08/25/2026 2 27.2 88.9 2025-032 SP 94.9 25.0 93.7 95 D6938 Fail
Location : Backfill at the 36" RCP outlet from OCS at Pond A, Elv/Depth :6 feet below top of OCS
Comment : Gauge Serial No. :91643
08/25/2026 3 22.7 92.0 2025-032 SP 94.9 25.0 96.9 95 D6938 Pass
Location : Backfill at the 36" RCP outlet from OCS at Pond A, Elv/Depth :6 feet below top of OCS
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 25, 2026