- Density Test Report Report ID: 97227
- Edit Download Report
Density Test Report
Date :08/26/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :08/26/2026 07:30
Onsite Hours :08:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :08/26/2026 15:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/26/2026 | 1 | 13.3 | 102.3 | 2025-033 SP | 104.0 | 16.2 | 98.4 | 95 | D6938 | Pass |
| Location : | Fill placement at roadway between B6.2 ST G1, B6 ST JB and B4-ST JB, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 08/26/2026 | 2 | 12.7 | 102.1 | 2025-033 SP | 104.0 | 16.2 | 98.2 | 95 | D6938 | Pass |
| Location : | Fill placement at roadway between B6.2 ST G1, B6 ST JB and B4-ST JB, Elv/Depth :7 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 08/26/2026 | 3 | 18.1 | 123.0 | 2025-035 SP | 107.8 | 13.0 | 96.6 | 95 | D6938 | Pass |
| Location : | Fill placement at roadway between B6.2 ST G1, B6 ST JB and B4-ST JB, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 08/26/2026 | 4 | 17.8 | 103.3 | 2025-035 SP | 107.8 | 13.0 | 95.8 | 95 | D6938 | Pass |
| Location : | Fill placement at roadway between B6.2 ST G1, B6 ST JB and B4-ST JB, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, August 26, 2026
Reviewer Name / DateKenneth Mosman, September 01, 2026