Density Test Report

Date :09/08/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :09/08/2026 07:30
Onsite Hours :10:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :sunny
Departure Time :09/08/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/08/2026 1 13.6 99.6 2025-033 SP 104.0 16.2 95.8 95 D6938 Pass
Location : Backfill at west side abutment wall to sanitary sewer manhole #2 , Elv/Depth :4 feet below final grade
Comment : Gauge Serial No. :91643
09/08/2026 2 13.2 99.6 2025-033 SP 104.0 16.2 95.8 95 D6938 Pass
Location : Same as 1, Elv/Depth :4 feet below final grade
Comment : Gauge Serial No. :91643
09/08/2026 3 14.0 100.1 2025-033 SP 104.0 16.2 96.2 95 D6938 Pass
Location : Same as 1, Elv/Depth :2 feet below final grade
Comment : Gauge Serial No. :91643
09/08/2026 4 22.4 92.0 2025-032 SP 94.9 25.0 96.9 95 D6938 Pass
Location : Same as 1, Elv/Depth :2 feet below final grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, September 8, 2026
Reviewer Name / DateKenneth Mosman, September 09, 2026