Density Test Report

Date :09/17/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/17/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :09/17/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/17/2026 1 12.9 100.9 2025-033 SP 104.0 16.2 97.0 95 D6938 Pass
Location : Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
09/17/2026 2 13.1 101.1 2025-033 SP 104.0 16.2 97.2 95 D6938 Pass
Location : Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
09/17/2026 3 21.2 110.8 2025-032 SP 94.9 25.0 96.3 95 D6938 Pass
Location : Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
09/17/2026 4 21.8 91.5 2025-032 SP 94.9 25.0 96.4 95 D6938 Pass
Location : Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, September 17, 2026
Reviewer Name / DateKenneth Mosman, September 23, 2026