- Density Test Report Report ID: 97736
- Edit Download Report
Density Test Report
Date :09/17/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/17/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :09/17/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/17/2026 | 1 | 12.9 | 100.9 | 2025-033 SP | 104.0 | 16.2 | 97.0 | 95 | D6938 | Pass |
| Location : | Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/17/2026 | 2 | 13.1 | 101.1 | 2025-033 SP | 104.0 | 16.2 | 97.2 | 95 | D6938 | Pass |
| Location : | Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/17/2026 | 3 | 21.2 | 110.8 | 2025-032 SP | 94.9 | 25.0 | 96.3 | 95 | D6938 | Pass |
| Location : | Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/17/2026 | 4 | 21.8 | 91.5 | 2025-032 SP | 94.9 | 25.0 | 96.4 | 95 | D6938 | Pass |
| Location : | Backfill at 18" RCP storm line between B5 and B6, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, September 17, 2026
Reviewer Name / DateKenneth Mosman, September 23, 2026