Daily Field Report

Date :09/30/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/30/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :09/30/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative observed the pipe contractor Savannah continue backfill for the 24″ RCP storm line between manholes B 5.1 and B 5.2. Density tests were performed on the backfill placed.

The writer also observed the paving contractor NWGP continue subgrade preparation at Unit 4, Phase 2 observing several areas being low requiring 2″ to 8″ of additional fill placement to achieve subgrade.

The curbing contractor continued pouring eight additional inlet throats at the Unit 4, Phase 2 side road. The reinforcing was observed to be in compliance with site specifications for size, spacing and quantity.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Backfill and compaction efforts at 24" rcp storm line between B 5.1 and B 5 .2

Subgrade prep. at Unit 4 phase 2

Backfill at 24"rcp storm between B 5.1 and B 5.2

Technician Signature / DateClyde Smith, September 30, 2026
Reviewer Name / DateKenneth Mosman, October 21, 2026