- Home
- Density Test Report Report ID: 97917
- Edit Download Report
Density Test Report
Date :09/30/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/30/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :09/30/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/30/2026 | 1 | 22.4 | 110.8 | 2025-032 SP | 94.9 | 25.0 | 95.4 | 95 | D6938 | Pass |
| Location : | Backfill at 24" RCP storm, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/30/2026 | 2 | 21.9 | 91.6 | 2025-032 SP | 94.9 | 25.0 | 96.5 | 95 | D6938 | Pass |
| Location : | Backfill at 24" RCP storm, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, September 30, 2026
Reviewer Name / DateKenneth Mosman, October 21, 2026