Skip to content

Density Test Report

Date :09/30/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/30/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :09/30/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/30/2026 1 22.4 110.8 2025-032 SP 94.9 25.0 95.4 95 D6938 Pass
Location : Backfill at 24" RCP storm, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
09/30/2026 2 21.9 91.6 2025-032 SP 94.9 25.0 96.5 95 D6938 Pass
Location : Backfill at 24" RCP storm, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, September 30, 2026
Reviewer Name / DateKenneth Mosman, October 21, 2026