- Home
- Density Test Report Report ID: 98565
- Edit Download Report
Density Test Report
Date :11/16/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :11/16/2026 07:30
Onsite Hours :10:00
Name of the Project :Naturewalk PHASE 3, UNIT 4 (formerly called PH 2 Extension) Lots
Project Location :Dallas
Weather :Sunny
Departure Time :11/16/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/16/2026 | 1 | 14.6 | 98.8 | 2025-033 SP | 104.0 | 16.2 | 95.0 | 95 | D6938 | Fail |
| Location : | Backfill at 8" sanitary sewer line between Z 11.9 and Z 11.10, Elv/Depth :-5' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 11/16/2026 | 2 | 14.3 | 100.1 | 2025-033 SP | 104.0 | 16.2 | 96.2 | 95 | D6938 | Pass |
| Location : | Same as 1, Elv/Depth :-5' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 11/16/2026 | 3 | 14.9 | 100.5 | 2025-033 SP | 104.0 | 16.2 | 96.6 | 95 | D6938 | Pass |
| Location : | Same as 1, Elv/Depth :-3 | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 11/16/2026 | 4 | 13.1 | 99.8 | 2025-033 SP | 104.0 | 16.2 | 96.0 | 95 | D6938 | Pass |
| Location : | Same as 1, Elv/Depth :-3' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, November 16, 2026