Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:
Observed the placement of fill/grading for Lots #73 and #111 today. Compaction tests were performed using a nuclear density gauge. The fill soils placed on Lot #73 were found to be too high in moisture and resulted in failing compaction tests. We recommend scarifying, aerating and recompaction in this area. A shallow excavation was made in one of the cut areas and the fill obtained from this area was placed and compacted on Lot #111. These soils were found to be closer to optimum moisture content and more workable. Results are attached in separate reports.
Please contact us if you have any questions regarding this report or of the density test results.

Picture showing a 77x45 sq ft backfill lot

Storm line pipe put on a packed dirt

The trench for the storm line pipe being packed by trench roller