Daily Field Report

Date :06/23/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :06/23/2026 07:30
Onsite Hours :9:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :06/23/2026 16:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative was on site to observe the grading contractor (JW) continue subgrade preparation by undercutting existing saturated sub grade soils for the roadway. The subgrade was probed using a 3/8″ diameter rounded end steel rod and recommendations were made to undercut -8″ and replace with additional base stone (GAB) compacting to 98%. The first forty feet was undercut -8″ and remaining areas being observed was recommended to clip -6″ replacing with additional base stone. The subgrade area observed today was just past the mailbox Kiosk drive. The contractor only undercut and clipped subgrade areas today (did not place any base stone).

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Undercutting and clipping existing saturated sub grade soils -8" to -6",observing by probing using a rounded end steel rod.

Fuel truck observed on sub grade with no movement after clipping.

Showing depth of undercut

Probing using a rounded end steel rod

Technician Signature / DateClyde Smith, June 23, 2026
Reviewer Name / DateKenneth Mosman, June 26, 2026