Skip to content

Daily Field Report

Date :04/26/2022
Project No :2021C059
Client Company :Pulte Group
Arrival Time :04/27/2022 13:00
Onsite Hours :03:00
Name of the Project :521 Atlanta Road
Project Location :Atlanta, GA
Weather :Sunny
Departure Time :04/27/2022 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

On April 27, 2022, our AS Engineering and Consulting, LLC
(ASEC) visited the site at the client’s request to observe and perform slab and footing
excavations for footings for Lots 33, 34, and 35. The footing excavation exposed a loose to medium dense
silty fine sand. Soils were found to be acceptable for an allowable soil bearing pressure of 2,500 psf.  Further observation revealed the pads were not ready for concrete placement due to the following:

  1. Missing vapor barrier
  2. Reinforcement steel not placed.
  3. Missing wire mesh

Footing concrete should be placed before the onset of inclement weather. If excavations are exposed to rain prior to concrete placement, ASEC should be contacted to revisit the site.

Technician Signature / DateVidal Dias, April 26, 2022
Reviewer Name / DateKenneth Mosman, May 08, 2022