Daily Field Report

Date :02/21/2024
Project No :2022C205
Client Company :Pulte
Arrival Time :02/21/2024 18:00
Onsite Hours :08:00
Name of the Project :Enclave at Parkway Village
Project Location :Union City
Weather :clear night
Departure Time :02/22/2024 02:00
ASEC Technician Name :Isaac Davis

Observations/Finding

Our AS Engineering & Consulting, LLC representative was on site to perform a foundation bearing inspection for the following lot footings:

Parkside, Lot Numbers #122, #123, and #124

Lot #122:

  • H1F (NW)
    • FT1: Light brown/red sandy silt micaceous rocky, blows = 11.
    • FT2: AR – rock = 1ft 8in, offset AR – rock = 1ft 6in, offset AR = rock 10in.
  • H2B (SE)
    • FT1: AR – rock = 6in, offset AR – rock = 11in, offset light brown/white sandy silt micaceous = 15+ blows.
    • FT2: AR – rock = 1ft 3in, offset AR – rock = 4in.
    • Probing: Used 3/8″ diameter probe rod.  Sections on top exhibited soft areas between rocky sections (approximately 4 to 5 inches).

Lot #123:

  • H1F (NW)
    • FT1: AR – rock = 4in, offset AR – rock = 9in, offset AR – rock = 6in, offset AR – 11in.
  • H2B (SE)
    • FT1: Light brown/red sandy silt micaceous, rocky – 15+ blows.
    • FT2: AR – rock = 1ft 5in, offset AR – rock = 11in, offset AR – rock = 6inches.

Lot #124:

  • H1F (NW)
    • FT1: AR – rock = 10in, offset AR – rock = 6in, offset AR – rock = 11in.
  • H2B (SE)
    • FT1: Light brown sandy silt micaceous – 8 blows.
    • FT2: Light brown/grey/red sandy silt micaceous – 11 blows.
    • FT3: AR – rock = 2ft 9in, offset AR – rock = 10in.

Additional Information:

  • Rebar and Wire Mesh: After the second inspection, both were found to meet job specifications for size, spacing & quantity.
  • Informed Austin after the second inspection to demuck and drain out the standing water in the footing due to rain. No confirmation of the issue being completed has been received.

Technician Signature / DateIsaac Davis, February 21, 2024
Reviewer Name / DateKenneth Mosman, March 15, 2024