- Home
- Daily Field Report Report ID: 84835
- Edit Download Report
Daily Field Report
Date :08/27/2025
Project No :2021C060
Client Company :Pulte Group
Arrival Time :08/27/2025 09:00
Onsite Hours :01:30
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :Sunny
Departure Time :08/27/2025 10:30
ASEC Technician Name :Sean Willett
Observations/Finding
On the above date, our representative was onsite was requested by the contractor for a footing inspection of lot #149 pod #14.
Our representative inspected the site, and probe rodded the footing and found a low compaction area located on the front left corner of the building pad (as displayed in drawing). This area was recommended to be excavated approx. 2ft deep. This area was flagged with white flags approx. 3ft to 4ft in each direction of the footing. The rest of the footing around the building pad showed proper compaction.
The site is properly prepped for concrete pour.

white flagged low compaction area

DCP results and low compaction drawing

lot 149 pod 14

probe test low compaction

probe test low compaction

DCP testing
Technician Signature / DateSean Willett, August 27, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025
