- Home
- Daily Field Report Report ID: 86604
- Edit Download Report
Daily Field Report
Observations/Finding
Purpose of Visit
As requested, an AS Engineering and Consulting (ASEC) representative visited the site to provide quality control inspection and testing services associated with the placement and compaction of fill/backfill materials. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved materials submittals.
Field Observations
Density testing was performed along the retaining wall in the pond area. Test results consistently indicated low compaction values. In response, a field proctor test was conducted, and a check plug was used to verify the accuracy of the proctor data.
Mr. Kisan Patel was present during the testing and confirmed that the field proctor results were accurate.
The contractor was advised of the failing density results and was recommended to use a sheep’s foot roller to achieve the required compaction along the retaining wall area. It was further emphasized that compaction should continue until the specified density is achieved before placing subsequent lifts.
Material Concerns and Coordination
The wall contractor’s crew expressed frustration regarding the material quality and compaction challenges encountered during testing.
At the request of Mr. Patel, a second laboratory proctor was performed on stockpiled fill material from the site. The laboratory test indicated a lower unit weight than what was specified for the retaining wall design.
Mr. Patel subsequently informed the wall design engineer and contractor of the results, and following review, the material was approved for continued use along the retaining wall.
Summary
-
Density tests along the retaining wall indicated insufficient compaction in multiple areas.
-
Field proctor verification confirmed test data accuracy.
-
A second lab proctor revealed a lower material density, which was approved for use by the design engineer after consultation.
-
ASEC provided recommendations for compaction improvement using the appropriate roller type and procedures.
Conclusion
AS Engineering and Consulting, LLC appreciates the opportunity to provide testing and inspection services on this project. Should you have any questions regarding this report, please feel free to contact our office. We will be happy to discuss our findings in further detail.


