Daily Field Report

Date :01/15/2026
Project No :2025C244
Client Company :McCallan Group
Arrival Time :01/15/2026 8:00
Onsite Hours :10:00
Name of the Project :Cassville Rd tract, proposed Burrito Wrap
Project Location :Cartersville
Weather :cold
Departure Time :01/15/2026 18:00
ASEC Technician Name :Mahendra Mylabathula

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day

The crew proceeded by removing soil from the pond excavation and placing it as backfill in the northeast corner of the site, covering a total of five lot areas (Lots #42, 43, 44, 45 and 46). The placed material was graded to the required elevations, and the soils were compacted.

Field testing indicated the backfill material contained a slightly higher moisture content than optimum; however, operations continued as planned. Final grading of the surface was performed, followed by compaction.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you

Technician Signature / DateMahendra Mylabathula, January 15, 2026
Reviewer Name / DateKenneth Mosman, February 12, 2026